vpp-ai-platform/contracts/fixtures/insight_card/trading-desk.json
Thomas Bayes 23fdf49ff2
Some checks are pending
ci / typescript (push) Waiting to run
ci / python (push) Waiting to run
ci / evals (push) Blocked by required conditions
M4: resource agent, envelopes live, review loop, insight cards
- packages/domain: AwardNotice, DISPATCH_PLAN proposal payload, ExecutionReport,
  MeteringRecord, potential-assessment and dispatch-optimization contracts,
  ReviewFinding (+ typed writebacks), SemanticMemoryEntry,
  EnvelopeChangeRequest, InsightCard — exported with fixtures on both sides.
- skills-py: potential-assessment (certified × rolling fulfilment, evidence
  days) and dispatch-optimization (per-interval LP on HiGHS, shortfall
  reported) skills + routes + tests.
- packages/services: dispatch rules in the policy pack (over-allocation,
  award anchor, lineage integrity for allocations); PowerBalanceSimulator;
  SimulationGateway (permit-only, idempotent, seeded execute → ExecutionReports);
  envelope deviation-streak suspension + apply(); ReviewService (attribution,
  reliability EWMA writeback, semantic memory, envelope recommendations as
  change requests); dispatch assembler; skill client methods.
- packages/runtime: resource agent; award-decomposition, review and
  envelope-review workflows; lifecycle selects simulator/gateway by proposal
  type; trigger hooks for awards, execution reports, metering; decide()
  resumes either lifecycle or envelope-review runs; insight cards API.
- Tests: docs/07 D-1 16:00 and D+1 end to end; reliability score 0.9 → 0.880
  and the next assessment de-rates capacity; envelope suspension on a seeded
  3-day streak; WIDEN request applied only by a human. 184 TS + 80 Python.
- docs/open-questions: B10 (reliability/potential parameters). README and
  CLAUDE.md status → M4 done, M5 next.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01UoYoGYzHkFyv3ALenkRPhA
2026-09-02 19:31:12 -04:00

25 lines
582 B
JSON

{
"id": "card-001",
"page": "TRADING_DESK",
"market_date": "2026-03-15",
"title": "Day-ahead situation",
"headline": "Risk LOW; P50 peak price 425.50 yuan/MWh",
"metrics": [
{
"name": "peak_price_p50",
"value": "425.50",
"unit": "yuan_per_mwh",
"ref": {
"tool_call_id": "tc-001",
"path": "quantiles.p50.values.76"
}
}
],
"source": {
"kind": "SITUATION_REPORT",
"id": "sit-001",
"ref": "aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa"
},
"generated_at": "2026-03-14T06:00:00Z"
}